About FROG Homes

Our Mission

Our mission is to bring together, co-ordinate and harness the collective expertise of South African consultants, suppliers and specialists each with a proven track record in their field to provide energy efficient and cost effective accommodation solutions to meet the needs of the current South African environment.

Our Product

Utilizing an up to date prefabricated modular superstructure together with engineered foundation and selected finishes, we are able to offer a completed home or office space at a price unmatched by traditional building methods. At the same time, our accommodation solutions will, in most cases, outlive conventionally built structures whilst providing the increased insulation values needed to meet todays energy efficiency standards.

Browse FROG Homes' Modular Units

In addition to the Modular units, FROG Homes' Complex provides the ideal solution for Full Title Cluster Development or Sectional Title Scheme.


Get started with the all new FROG Homes Starter Home Module with Modular Extension Options.

Who We Are

More than 4 decades of individual management experience in the residential and commercial property development sectors have given rise to the realization that simply applying green energy solutions to traditional and outdated construction methods falls short of fully addressing the real low carbon footprint needs of today. Calling on this experience, Fully Resourced Off Grid (Pty) Ltd. T/a FROG Homes have set out to address these needs with a complete low carbon solution that not only minimises energy consumption of the finished home but also optimises the use of valuable resources in production of the very structural component of the building itself.


The high, all round, efficiency of the system has been achieved by bringing together proven products and suppliers including a prefabricated, modular structural walling and roofing system. The result is the offering of 5 standard middle income housing or work from home units providing fully compliant, tough, permanent, well insulated accommodation built in a fraction of the time that traditional construction methods would take and at the most cost effective price.


Fully Resourced Off Grid (Pty) Ltd. T/a FROG Homes in association with Multi Urban Develoipments.





Pre-Construction...
The Process Made Easy

2. Preliminary

Once confirmed that we have the answer to your needs, FROG Homes will undertake the necessary preliminary steps including:

  • Determine Local Authority and Town Planning Conditions,
  • Obtain the Required Surveyor General Diagram,
  • Determine Title Deed Conditions,
  • Conduct the required Geotechnical Assessment,
  • Determine Electrical, Plumbing and Drain Laying Costs,
  • Submit a Final Costing and Preparing the Contract Document together with a Detailed Program.

3. Preparation

Once intitated, and having completed the necessary preliminary steps, FROG Homes undertakes to:

  • Prepare and Submit Working Drawings to the Local Authority
  • Engage a SAICA Certified Council Liaison Agent, and
  • Enrol the project with The NHBRC.

Where possible, we will require a copy of building plans of the existing site improvements but if, as is so often the case, original plans have been lost, we can also help in surveying existing structures and providing replacement drawings. Should you require further information, please contact us.


On-Site...
The Three Construction Stages

With no unusual or unforeseen delays, our entire construction program will be completed in 9 weeks from commencement on site to hand over of keys. This broadly breaks down as follows:


Stage 1

First 3 Weeks

Site Services, Foundation & Surface Bed. (The only Wet Trades).

Stage 2

Second 3 Weeks

Superstructure Including Walls, Roof, Doors, Windows & Electrical First Fix.

Stage 3

Third 3 Weeks

Plumbing & Electrical Final Fixes, Tiling and all Other Finishes.

Our 9 Week Site Program

9 Week Site Pprogram

On Site Activities

Stage
1
Stage
2
Stage
3
1 2 3 4 5 6 7 8 9

First 3 Weeks

Land Surveyor (Pegs and Levels)                
Excavate Founds/Eng Inspection/Elec & Plumb, D/laying Site Works              
Shuttering/Casting Surface Bed                

Second 3 Weeks

System Panel Walls/Roof/Windows/Ext and Int Doors/Electrical Fix            

Third 3 Weeks

Electrical Final Fix                
Plumbing Final Fix                
Painting External                
Floor Tiling (and other Floor Finishes)              
Kitchen Units                
Wall Tiling              
Built in Cupboards              
Finishing Carpentry, including Cladding              
Painting Internal                
Carpentry Fix (Bathroom Accessories/Shower Door)                
Contingency for Completion of Optional Items                

Get in Touch

Reach out to us for more information and discuss your specific requirements.


Contact Us
The South African Flag. FROG Homes is a building system solution based in South Africa. The South African Flag. FROG Homes is a building system solution based in South Africa. The South African Flag. FROG Homes is a building system solution based in South Africa. The South African Flag. FROG Homes is a building system solution based in South Africa.